PWay Projects
DATE CLIENT PROJECT SCOPE OF WORK
Jun-15 Quinn Elton Siding PWay design  work for the new Rail Terminal for the world's largest glass factory near Liverpool.
2014 Network Rail Doncaster Rail Terminal Permanent Way design feasibility layout and final design
2010-2013 SREI BMRCL Detailed Design – Trackwork Systems (Alignment design, Trackwork detailed design, BOQ, tender specification), Rail‐structure interaction study, Noise and Vibration Study, Track stiffness and Transition (ballasted to ballastless) designs, Track plinth & slab structural designs, Track fastening system & Sleeper designs, Stray current mitigation measures design, Detailed cost estimation.
2013 CIDCO Navi Mumbai Metro  Trackwork pre‐tender design for Navi Mumbai metro rail project, Detailed study of alignment (about 12km) and depot, Estimation of quantities of various track components (rails, fastening, check rails, sleepers, turnouts etc.), Preparation of detailed BOQ for entire trackwork, Preparation of interface drawings
2013 L&T Railway SBU Riyadh Metro Evaluation of bid documents prepared by L&T, architectrual description including safety and reliability design, inputs for reliability data
2012 MEGA Metrolink Express for Gandhinagar and Ahemdabad Detailed design of trackwork - Detailed design of alignment (39 route km, 2 depots), track plinth, track components, fastening system, drawings, tender documentations etc.
2012 SREI Bangalore Metro Detailed design of alignment (42 route km, 2 depots), track plinth, track components, fastening system, GFC drawings, tender documentations etc.
2011 AECOM Hyderabad Metro Rail Projects Review of DPR, Concession Agreement, Manual of Specifications and Standards regarding trackwork, Design Basis Report for ballastless (mainlines) and ballasted (depots) tracks; Preliminary Design Report for Trackwork for entire Project, Preliminary drawings for trackwork and its Components, Tender Specification drafting and tender drawings.